JLine :: RV-10 Build
   


About
Build log for an RV-10

By
Jae Chang
web@jline.com

Contents (Index)
These are links to the major kits for the project.

  • RV-10 Home Page
  • Latest Entries
  • Tools -- Photos
  • Airframe
    Tail -- Photos
    Wings -- Photos
    Fuse -- Photos
  • Avionics -- Photos
  • Finishing
  • Links

    Subscribe
    Subscribe to a syndicated feed of my weblog, brought to you by the wonders of RSS.

    Flavours
    There's more than one way to view this weblog; try these flavours on for size.

  • index
  • circa 1993
  • RSS
  • Links
    These are a few of my favourite links.

  • Van's Aircraft
  • Van's Airforce
  • Comments
    Most recent comments in the last ...

  • 30 days

  •        

    Sat, 21 Oct 2006

    Section 18: Right Fuel Tank (14 / 157 wings / 494 total)

    I decided to start the assembly of the right fuel tank, before starting any work with proseal. I will then have a back to back left and right tank proseal session to complete both tanks at the same time.

    First thing I "screwed" up was while drilling the extra hole in the fuel tank ribs for a return fuel line. I used the T-1003B as a template for drilling holes in the T-1004. The hole in the T-1003B needed to be offset from the flange to allow room for attaching the T-1010 anti rotation plate. I will need re-order 2x T-1003B's.

    I decided to drill 3 of the T-1004's. The return fuel line will thus terminate mid-tank.

    I finished clecoing, drilling, and deburring the right fuel tank.

    [IMG_4392]

    posted at: 17:44 | path: /aviation/build/airframe/wings/sec18 | permanent link to this entry | add a comment