| JLine :: RV-10 Build | |||||
|
By
Contents (Index)
Subscribe
Flavours
Links
Comments |
Sun, 09 Dec 2007
Section 17: Outboard Leading Edge (8 hours)
1. Final riveted the outboard most rib. Left this undone so that installing the Duckworks mounting bracket would be slightly easier. 2. Installed the Duckworks lights. Drilled and installed the nutplates onto the ribs. Created the mounting brackets for the lights to span the 15.5" span between the outer 2 ribs. Cutout the hole for the lights. Used a jigsaw. Then sanded down with a 1" drum sander. My first use of it, and i love it.
posted at: 18:36 | path: /aviation/build/airframe/wings/sec17 | permanent link to this entry | add a comment |
||||