| JLine :: RV-10 Build | |||||
|
By
Contents (Index)
Subscribe
Flavours
Links
Comments |
Mon, 26 Jun 2006
Started Inventory (3 / 3 wings / 324 total)
Today, I started to inventory the wings. After taking a month long break from building, while waiting for the wings to arrive, i have to get reacquainted with the builder's mindset. Looking at all of these parts and pieces is daunting. In an instant, I had flashed through a mental slide show of all the steps that lay ahead of me: deburring, sanding, match drilling, alumiprep, alodine, primer, and riveting. Let's get the show on the road, and start by opening up the crates.
posted at: 22:04 | path: /aviation/build/airframe/wings | permanent link to this entry | add a comment |
||||