JLine :: RV-10 Build
   


About
Build log for an RV-10

By
Jae Chang
web@jline.com

Contents (Index)
These are links to the major kits for the project.

  • RV-10 Home Page
  • Latest Entries
  • Tools -- Photos
  • Airframe
    Tail -- Photos
    Wings -- Photos
    Fuse -- Photos
  • Avionics -- Photos
  • Finishing
  • Links

    Subscribe
    Subscribe to a syndicated feed of my weblog, brought to you by the wonders of RSS.

    Flavours
    There's more than one way to view this weblog; try these flavours on for size.

  • index
  • circa 1993
  • RSS
  • Links
    These are a few of my favourite links.

  • Van's Aircraft
  • Van's Airforce
  • Comments
    Most recent comments in the last ...

  • 30 days

  •        

    Tue, 26 Aug 2008

    Section 45: Cabin Doors and Transparencies (5 hours)

    I started the "final" fitting of the doors. This involved basically drawing a line around the entire door about 1/16th to 1/8th inch in to just trim off slight bits.

    The main problem is that you do not know how much to trim, until you have trimmed too far. Thus, i figured it is better to take off small increments than to try to do it all at once.

    I reached a point where the door edge no longer was the binding point. The door frame now needed trimming because it was touching the inside door shell. Thus, I shifted to drawing lines on the door frame for sanding down, to approx. a 1/8th gap.

    The pictures below show my favorite tool and the most used, besides the drill. I have been able to cut almost anything and now i am sanding using the same tool. I have the craftsman clone of the rotozip, but i may buy a rotozip to have a spare around. That way I do not have to swap out tool heads as much.

    [IMG_1472] [IMG_1473] [IMG_1474] [IMG_1475]

    posted at: 10:12 | path: /aviation/build/airframe/finishing/sec45 | permanent link to this entry | add a comment