JLine
   


About
JLine, Home of JLine Systems

By
Jae Chang
web@jline.com

Subscribe
Subscribe to a syndicated feed of my weblog, brought to you by the wonders of RSS.

Flavours
There's more than one way to view this weblog; try these flavours on for size.

  • index
  • RSS
  • Links
    These are a few of my favourite links.

  • Wind Rat Pack
  • link 2
  • link 3
  • Comments
    Most recent comments in the last ...

  • 30 days

  •        

    Tue, 25 Dec 2007

    Section 23: Aileron Actuation (10 hours)

    I finally reordered the aileron control tubes and redid them. This time I did a MUCH better job. This is what i learned:

    1. Everything up to the point of primering the insides of the tubes is pretty straight-forward. I still can't seem to drill straight with the drill-press - did my best.

    2. Primering. The best technique was as follows:

    a. Heating up the control tube to get the fittings off of each end is a must sometimes.
    b. After deburring holes, clean by soaking a paper towel in acetone and pushing thru the tube with a dowel.
    c. Put one fitting on one end. This will be the cap for this end of the tube.
    d. Tape over all the drilled holes, so that paint won't leak all over the place.
    e. Pour paint into the other end, liberally. Cover end with just a paper towel and swirl the paint around for even coverage.
    f. Then just pour the left over paint.
    g. Also, it's good to get this set up ahead of time. Hang the tube with open end down, so the rest of the paint can dribble out the end into a cup or whatever.
    [IMG_5782] [IMG_5783] [IMG_5784]

    posted at: 14:56 | path: /aviation/build/airframe/wings/sec23 | permanent link to this entry | add a comment